[A vibration status check situation]

1. No. 3 of I Core and No. 4 of E Core interval confirmation slope have been the most effective within 0.8~1.3m/m within 0.4~0.8m/m 400 ~650 within the same BOWL 400.

2. It is untie a nut located in position NO. 6 Core Side to have gained doing coordination and adjust an interval.

3. A Plate Spring check to have gained NO.5
1) Damage confirmation of Plate Spring
2) While giving the power to Plate Spring with a hammer or giving force to right and left of one side intensely, check whether it is with for Plate Spring to be short.(When an interval of I Core is mostly different from E Core, a balance of power is irregular)
3) Plate Spring damage confirmation process - confirm it while hitting Plate Spring.
4) It is that electronic coil voltage confirmation - blue line 110V, red line 220V.
5) Finally, you must tighten it exactly because a volt and a nut may untie by vibration.